- Version
- Download 0
- File Size 144.75 KB
- File Count 1
- Create Date September 28, 2026
- Last Updated September 28, 2026
Exhibit J - Engineering Validation Report Test Plan & Technical Risk Register
The PPM states that continuous self-sustaining operation, net-positive external energy production, and modeled commercial output are not established in the reviewed materials. Attach validated evidence only, and identify design targets separately from measurements.
